
Complete closure of the A7 north of Hamburg
Due to maintanace work on the high-voltage line, the A7 motorway will be completely closed in both directions between the Kaltenkirchen and Bad Bramstedt exits on Sunday, January 22, from 8:00 to 12:00.
Traffic towards Hamburg is diverted at the Bad Bramstedt junction (17) along the U 66, and towards Flensburg at the Kaltenkirchen junction along the U 45.
In addition, the following diversions are recommended for long-distance traffic: from the A7/A1 Horster Dreieck junction (37) south of Hamburg or from the A1 at the Buchholzer Dreieck junction (43) and then along the A1-A21-B205 to the Neumünster-Süd junction (15) or in the opposite direction for north and south-bound traffic. The diversion is indicated by variable message signs placed along the route.
Latest Posts
Mont Blanc Tunnel maintenance: closures in February and March
Due to scheduled maintenance work, the Mont Blanc Tunnel, which connects Italy and France, will be completely closed on several dates in the second half of...
Germany: Traffic restrictions on the Norderelbe Bridge on the A1
As part of the expansion of the A1, work has begun on the new Norderelbe Bridge, which is to connect Hamburg-Wilhelmsburg with Rothenburgsort. Its...
Changes on the Paris ring road, A1 and A13 – a special lane and an HGV driving ban
Since March 3, a a special lane has been added to the Paris ring road and sections of the A1 and A13 motorways. The lane is designated for vehicles with at...